Case

The current position: Home > CASE Study > Error analysis of wind and solar complementary projects

Error analysis of wind and solar complementary projects

Time:2017/1/3 12:06:36 Tencent weibo Sina weibo

Problems:
1 The PV module space is too large of a horizontal installation, it waste the space and easy to plot ash
2.Each column has 3 modules.It is too heavy for the bracket, resulting in bracket bending
3.The bracket frame is too low, the vegetation will cause the shadow

We suggest:

Using vertical installation of modules, each column arrange 2 panels,
 the height of bracket is 50cm from the ground at least, and  increase the spiral pile on the ground.