The current position: Home > CASE Study > Error analysis of a project in Hebei

Error analysis of a project in Hebei

Time:2017/1/3 12:06:04 Tencent weibo Sina weibo

Problems:
1.The modules applied the same line space  between the sunny side and shady side, which will cause the waste of land and the system lose in shade slope.
2.Panel vertical arrangement. In fact, in the mountain area the panel is easy to be shaded, compared with the horizontal layout,
the vertical arrangement will caused more power.

For this kind of solar power station, we suggest:
1.Considering the ecological effect, it is better to choose spiral steel pile as the base.
2.Evaluate the maintenance cost before build up the station. The equipments tranport cost and electricity transfer cost are high.
3. For the sunny side and shady side , we must use the different line space (if there is azimuth angle, need consider together).