Jinjiang 1200kw shopping mall Project

Time:2016/11/22 12:30:24 Tencent weibo Sina weibo

Project Name: Jinjiang 1200kw shopping mall Project
Place:  Jinjiang city, Fujian province
Time: 2016.1
Client requirments:

connect to the nearest 380v grid utility, maximium utilize the space,centralized 

monitoring scheme and easy

Technical requirement level:

High-  1200KWp PV on grid system is divided into 4 independent power generating

 unit.The system is divided into a plurality of photovoltaic power generation unit, 

respectively connected substation low voltage cabinet by interval, the whole PV 

system access 380V low voltage AC power grid connection scheme, realize the 

comprehensive optimal economic scheme.

There are a lot of the obstacles on the roof and the panels also have azimuth 

angle. Considering the project size, the manual measurement is impossilbe for 

this project. We use the laser theodolite to locate the base position, it avoid the 

shadow caused by the obstacles.

Wind and salt resistance requirement:

High-Due to the coastal project, considering the wind resistance level required, the

 base is using 315mm pvc tube cut into 400mm high as the mould. Two chemical 

anchor bolts were planted into the PVB base mould, and the tensile test was done.